TenderLens
TenderLens — BOQ Pricing Intelligence
Engineering estimation, reimagined.
A pricing intelligence platform for Bills of Quantities: it processes BOQ documents, matches items against the PWD Schedule of Rates for the selected zone, shows the source behind every rate, and keeps a human in charge of uncertain matches before exporting a priced BOQ.
- Status
- In development — Actively being built; not yet publicly released.
- Category
- Engineering intelligence · AI-assisted workflow automation
- My role
- Product concept, workflow design and AI-assisted development
(01)The problem
Theproblem.
Pricing a tender means working through long BOQ documents line by line.
- 01Slow, manual lookups against the Schedule of Rates
- 02Results that depend heavily on individual experience
- 03Hard to show where a rate came from
- 04Inconsistent pricing across projects and estimators
(02)My contribution
What Idid.
- Broke the estimator's job into discrete, reviewable steps
- Designed the matching flow around evidence and human review
- Building the product with AI-assisted development
(03)Solution & architecture
How itfits together.
Structure first, then match, then verify. Every proposed rate carries its source, and anything uncertain is routed to a person instead of being guessed.
Layer 01
Ingest
- BOQ Excel / PDF processing
- Item structuring
Layer 02
Match
- PWD Schedule of Rates matching
- Zone-specific rate selection
- Uncertain-match flagging
Layer 03
Verify & export
- Source and rate evidence
- Human review
- Pricing analysis
- Excel export
(04)Interactive walkthrough
See itwork.
From BOQ to priced output
Ingest
BOQ upload
An estimator uploads a BOQ as Excel or PDF.
Where each step happens: Ingest · Match · Verify · Export
Try the review loop
Interactive demo · dummy BOQ, demo schedule references
Zone: Demo zone| Item | Description | Unit | Status |
|---|---|---|---|
| 1.01 | Earthwork in excavation in ordinary soil | m³ | Waiting |
| 1.02 | Sand filling in foundation, compacted | m³ | Waiting |
| 2.04 | Brick work with first class bricks | m³ | Waiting |
| 3.10 | Reinforced cement concrete works | m³ | Waiting |
| 4.02 | Plaster to walls, 12 mm thick | m² | Waiting |
(05)Product gallery
Productgallery.
Screenshots coming soon
Real product screens are being prepared for this case study.
Rather than fill this space with mock-ups, it will show genuine screenshots (with demo data) as soon as they are approved.
- BOQ uploaddesktop · Sample/dummy BOQ
- Matching resultsdesktop · With source evidence panel
- Review queuedesktop · Uncertain matches
- Excel exportdesktop · Exported sample
- Workflow walkthroughvideo · Short screen recording
(06)Feature walkthrough
Featureby feature.
- 01In development
BOQ Excel / PDF processing
Ingest
- 02In development
Item structuring
Ingest
- 03In development
PWD Schedule of Rates matching
Match
- 04In development
Zone-specific rate selection
Match
- 05In development
Uncertain-match flagging
Match
- 06In development
Source and rate evidence
Verify & export
- 07In development
Human review
Verify & export
- 08In development
Pricing analysis
Verify & export
- 09In development
Excel export
Verify & export
(07) Technology
Technology details will be listed here once confirmed.
(08) Business value
- Faster first-pass pricing for estimators
- A visible source behind every rate
- Consistent rate selection by zone
- Human judgement kept where it matters: uncertain items
Verified outcomes
Measured outcomes will be published here once verified — no estimates or invented numbers.
Related work
Next step
Need something similar?
Have a document-heavy, rules-driven process your experts repeat every week? Let's see how much of it can be structured and automated.